Featured Stories

Other Pamplin Media Group sites

Local Weather

Cloudy

86°F

Portland

Cloudy

Humidity: 21%

Wind: 5 mph

  • 14 Sep 2014

    Clear 88°F 62°F

  • 15 Sep 2014

    Mostly Sunny 94°F 60°F


Lucid strikes deal for company to install, operate its in-pipe hydro power system

Site Based Energy, a four-year-old Idaho company, has agreed to be the principal investor and operator of a new in-pipe hydro power system developed by Portland’s Lucid Energy called the Conduit 3 Hydroelectric Project.

Lucid’s installs turbines inside water pipes that produce electricity from gravity-fed moving water. It received regulatory approval this month to install its first commercial system in cooperation with the Portland Water Bureau. The system is expected to be completed by October.

Site Based Energy focuses on building small hydro projects throughout North America.

For more information: lucidenergy.com; sitebasedenergy.com.